How to Assemble SKD Tractors – Step-by-Step Guide for African Farmers
SKD (Semi Knocked Down) tractor shipments offer a cost-effective and practical solution for importing tractors, especially across African and Middle Eastern markets. By shipping tractors in partially disassembled form, businesses reduce freight costs and import duties. However, once the shipment arrives, the tractor must be properly assembled to ensure safety, functionality, and longevity.
This guide from AECO EXPORT COMPANY provides a detailed, step-by-step SKD tractor assembly process, designed specifically for farmers, dealers, and workshop technicians across Africa.
1. Preparation Before Assembly
Before beginning the assembly process, ensure you have access to a clean, flat, and level surface. Avoid sloped or uneven ground to prevent accidents or misaligned fittings. Prepare all required tools, safety gear, and unpack the shipment carefully.
As seen in the picture, that SKD Packaged Tractor is placed on an even ground securely with its other components securely packaged inside the wooden frame and the tire behind it is added separately from the SKD Wooden Crate. AECO Export Company provides SKD shipment in the most secure and seamless manner.

2. SKD Tractor Assembly Instructions (Step-by-Step)
Step 1 – Set Up on a Level Surface
Ensure that the tractor is assembled on flat terrain. A stable surface helps maintain part alignment and reduces the risk of assembly errors.
Step 2 – Fill Radiator with Water or Coolant
Use clean water or the coolant recommended by the manufacturer. This prevents the engine from overheating during the idling and startup process.
Step 3 – Idle the Tractor Post-Assembly
After full assembly, idle the tractor for six hours without applying load. This allows the engine and systems to adapt, and helps identify any potential issues.
Step 4 – Conduct 2-Hour Fluid Level Inspection
After two hours of idling, inspect all fluid levels:
- Engine Oil – Ensure it is at the proper level for lubrication.
- Hydraulic Oil – Required for smooth lifting and steering functions.
- Steering Oil – Affects control accuracy.
- Air Cleaner Oil – Prevents dust from entering the engine.
Top up any low levels and confirm there are no discrepancies
Step 5 – Fill Fuel Tank with Clean Diesel
Add filtered diesel to avoid clogging the fuel injection system. Always use clean, high-quality diesel to protect the engine.
Step 6 – Inspect for Oil and Water Leakages
Carefully check engine and hydraulic systems for leaks. Examine pipe joints, seals, and connection points. Tighten where necessary.
Step 7 – Secure All Pipe Fittings
Verify that all pipes are tightly secured. Improper connections can cause performance failures or safety hazards.
Step 8 – Check Battery Electrolyte
Inspect battery electrolyte levels. Refill if needed and recharge the battery to ensure proper electrical ignition.
Step 9 – Start the Engine
Start the engine and allow it to run for an additional two hours. Keep the hydraulic arms in the down position to stabilize the system pressure.
Step 10 – Total Assembly Time
The full SKD tractor assembly and testing process takes approximately eight hours, including idle and integrity checks.
Step 11 – Tractor is Now Operational
Once all steps are complete, your tractor is fully operational. Whether it’s ploughing, tilling, or transporting, your machine is ready for agricultural duty.
3. Tools Required for SKD Tractor Assembly
- Adjustable wrench set
- Hydraulic jack
- Screwdriver kit
- Torque wrench
- Grease gun
- Coolant and engine oil
Why Choose AECO EXPORTS for SKD Tractors?
At AECO EXPORTS FZE, we offer:
- 100% brand-new tractors with genuine Perkins engines
- Accurate documentation and certificate of origin
- Expert guidance on SKD assembly
- Fast delivery to Africa, GCC, and global ports
Frequently Asked Questions (FAQ)
Approximately 6–8 hours, depending on team experience.
We recommend having a trained technician or mechanic supervise the process.
Yes. AECO EXPORTS offers video guidance and live support upon request.
All major tractor components, plus fasteners, fittings, and manuals.